Science Block Roof Top Dome

Project Title: Science Block Roof Top Dome
Client: Watford Grammar School for Girls
Value: 290000
Programme: 16 Weeks – completed September 2015

Brief

This prestigious Grammar School required a signature state of the art building as a show piece for their renowned science department.

Challenges

Over 60 tonnes of steel had to be craned on to the Science block roof during term time. An opening had to be cut into the roof slab to connect the new dome to the existing staircase.

Outcomes

A section of the playground was fenced off and scaffold landing platforms erected to take new steel beams. A ply and timber deck was erected below the existing staircase soffit to prevent debris from the breakthrough falling into the stairwell. Noisy cutting works were executed out of school hours.

Are you a Construction Consultant managing a Portfolio of buildings?

If you are looking to convert a building please do feel free to give our team a call and see how we can help you transform your space into a more profitable or beneficial environment.

Find out how we can help

Do you have a specialist requirement?

If you are looking to convert a building please do feel free to give our team a call and see how we can help you transform your space into a more profitable or beneficial environment.

Talk to our team