The Blood Products Laboratory in Elstree will shortly be substantially expanding their production centre so the need for additional water treatment facilities was a key pre-requisite in achieving their new objectives.  ES Moss have played an important role in facilitating two new Final Settlement tanks by the construction of a very large base constructed from 134 cubic tonnes of reinforced concrete and twenty two 16 metre deep bored piles, surrounded by a perimeter 52 cubic gabion stone walls.